Teck Coal Administrative Building

Partnering with Threeosix Industrial, 3twenty constructed and delivered a complementary Administrative Building with unique needs offsite in Saskatoon while a new water treatment plant was constructed on site in British Columbia.

Project Summary

As part of their ongoing work under the Elk Valley Water Quality Plan, Teck Coal began construction of a new water treatment facility at Fording River Operations in 2020. The facility’s purpose was to remove selenium and nitrate from mine-affected water to maintain the health of the watershed and allow for continued sustainable mining in the region.

With the new plant, Teck Coal needed an Administrative Building for its operations. Working with Threeosix Industrial, 3twenty provided the design and construction of a 6,103-square-foot facility with all the necessary amenities including multiple office spaces, a large conference room, a control room, male and female wash/change rooms, a spacious lunchroom with a kitchenette, and two lab rooms fit with fume hoods, emergency showers, lab sinks, and acid resistant millwork. The Administrative Building was designed to fit with the water treatment plant from a visual and technical perspective, was constructed simultaneously in 3twenty’s yard, and then shipped to site for install.

Project Details

Spacious meeting rooms, control room, lunch room, and offices.

Two lab areas fit with emergency showers, lab sinks with acid resistant drains, fume hoods, and acid resistant milkwork.

Exterior to match adjacent water treatment facility.

Non-combustible construction.

Size: 6,103 ft2
Location: Elkford, BC
Built: 2020

Project Photos

Contact 3twenty

3twenty Modular is a design-build general contractor that delivers projects using a modular building process. We are focused on providing turnkey building solutions to the commercial, education, institutional and industrial markets in Western Canada.

Join the Team

111 Prospect Road
Saskatoon, SK, S7R0H4
(306) 382-3320

info@3twenty.ca