Regina Airport Authority

 

Size: ~1,440 ft2   Timeline: 8 weeks   Year: 2016

 

PROJECT SUMMARY

The Regina Airport Authority hired Quorex Construction as a prime contractor and Pattison MGM as the architect to manage a number of expansions at their airport. One of the building projects was a screening facility for airside traffic. The project involved a pre-engineered steel building structure that vehicles could drive through, and needed to be attached to office space. 


THE DETAILS

  • Very high snow load requirement on modular building because of placement adjacent to pre-engineered building
  • Special design considerations given to integration and connection to the pre-engineered building
  • Strict architectural guidelines to be followed to ensure compliance with the rest of the airport expansion
  • Structure had to accommodate being unloaded and placed at grade
  • Very tight timeline